Final Report
Chapter 7 Outline of Scope of Works
(2) Necessity (Relevance)
MPT uses an underground duct system when laying cables in urban areas. As described in
Section 7.1.3, it plans to expand the metro network using fiber optic cables, but as there is no
available space in the existing ducts, more new underground embedded ducts will have to be
installed.
(3) Scope of upgrade
The scope of the upgrade plan is shown in the metro network planned duct route in each of the
following cities.
(a)
Figure 7.1-5
Yangon Metro Network Planned Duct Route
(b)
Figure 7.1-6
Naypyitaw Metro Network Planned Duct Route (1/2)
(c)
Figure 7.1-7
Naypyitaw Metro Network Planned Duct Route (2/2)
(d)
Figure 7.1-8
Mandalay Metro Network Planned Duct Route
7-7