designed by the CBM-NET Phase 2 application vendor and will be confirmed by CBM
in the external design phase.
(6) Prerequisite
For the specification, CBM will conduct required review and confirmation in timely
manner. CBM is requested to submit a list of the necessary alert and dashboard
functions prior to the external design phase.
3.2.4.2 Implementation Policy and Conditions of Infrastructure
3.2.4.2.1 Disaster Recovery
(1) Disaster Recovery
To provide a means to continue CBM-NET services if the that primary site is affected
by disasters or incidents, the disaster recovery system will be implemented in this
project.
A remote disaster recovery (DR) site will be set up in the server room of the CBM
Nay Pyi Taw Head Office. At the DR site, infrastructure for CBM-NET Phase 2 will
be installed and configured. The CBM-NET system will be up and running at the DR
site.
Business data of CBM-NET will be replicated asynchronously between the primary
site and the DR site, by using the database function. Asynchronous replication is
adopted because it can be used regardless of the distance between the primary and
DR sites. In addition, near-zero data loss can be achieved by using the database
replication function.
When DR is activated, necessary work must be done to recover the CBM-NET system
at the DR site.
The Targeted Recovery Point Objective (RPO) and Recovery Time Objective (RTO)
59