To install these systems, the CBM ICT System infrastructure consists of a data center, servers, storages, and network infrastructure was implemented as well as terminals for the systems in CBM and FIs in Myanmar. Source: Preparatory Survey Team of Phase 1 Figure 1: CBM-NET Phase 1 and CBM-OA 2.2 Overview of the Development Scope of this project In addition to adding the functions listed in Table 2 to the current functions implemented in the Phase 1 project, introduce the equipment necessary to introduce functions and accomplish infrastructure functions in Table 3. 1. STP 2. ISO 20022 adaptation 3. Liquidity Saving Feature and Message Queuing Table 2: System scope of Application  STP will use SOAP/XML protocols (Transactions will be encrypted.)  ISO 20022 will be applied to all applicable messages.    Accelerate use of CBM-NET by Increasing settlement availability within current deposit volume. LSF settles the payment instructions by event-driven (such as change of liquidity) BLOS and time-driven MLOS. The queue will be managed by priority and posted time of instructions. iv

Select target paragraph3