Final Report
Chapter 6 Review of Works Subject to ODA Loan
Table 6.3-1 Comparison Table for New and Old Serial Numbers and Titles of Works
Old
No.
Work Item
2
DWDM Transmission
Equipment to existing or
on-going FOC
7
Improvement of OSP facilities
(such as cable duct, MH and
Pole, etc.) for Metro Network in
3 Major cities
Location
Between 3
Major cities
New
No.
New Work Name
Infrastructure
1
Transmission Equipment
for the Backbone
Connecting the Three
Metro-cities
Infrastructure
2
Outside Plant Extension
in the three Metro Cities
Infrastructure
3
High Speed Optical Fiber
Network in three Metro
Cities
3 Axis Class
3 Major
Cities
8
Improvement of FOC NW and
FWA within Metro Cities
15
LTE Expansion in 3 Major
Cities
3 Major
Cities
Infrastructure
4
21
Access NW Expansion in
Medium and Small cities
Medium and
Infrastructure
Small Cities
5
5
DWDM Transmission
Equipment to Satellite
Communication link
Yangon –
Earth
Station
Telecom
Service
6
14
Replacement of GW in Yangon
Yangon
Naypyitaw
Telecom
Service
7
11
Improvement of ISP with
Introduction of IPv6
Yangon
Telecom
Service
8
1
27
30
Establishment of NOC(w/o
Building)
Introduction of CS-Info and
Data Management System
Establishment of Outside Plant
Engineering Center (OPEC) in 3
major cities
Naypyitaw
Naypyitaw
Business
Management
Business
Management
9
10
3 Major
Cities
Business
Management
11
24
Access to Thilawa SEZ
Yangon –
Thilawa SEZ
Contribute to
National
Project
12
LTE Expansion in three
Metro Cities
Network Plan Towns
along the Backbone
Network between
Connecting the Three
Metro-Cities
Install Transmission
Equipment for the
Yangon – Thanlin Circuit
(International Satellite
Earth Station)
National Gateway
Overhaul
Upgrading of ISP
Services and Introducing
IPv6 in Yangon
Network Operation
Center (NOC)
Construction
Outside Plant
Engineering Center
(OPEC) in the Three
Metro Cities
Outside Plant
Engineering Center
Building
Thilawa SEZ Circuit
Source: Survey Team
In addition, Figure 6.3-1 shows the newly-assigned serial numbers and work titles.
6-7