Final Report
Chapter 6 Review of Works Subject to ODA Loan
6.2 Filtering and Selection of Works
The works included in the wish list submitted by MPT and the recommendations made by the
Japanese side shown in Table 6.1-1, excluding the 4th, 12th and 24th works, were filtered and
narrowed down to a total of 22 works classified on the basis of the three strategic axes, taking into
account the following conditions.
1. MPT’s priority
2. Expected time the work should be completed using the ODA loan
3. Generally expected results of ODA loan, including expression of effect
Table 6.2-1 is the result of a review of the various conditions of the works included in the MPT
wish list and the recommendations made by the Japanese side shown in Table 6.1-1. In Table 6.2-1
works that were selected for continued review through filtering are indicated with a circle in the
Result column.
Table 6.2-1 Selection from Works in the MPT Wish List and Recommendations made
by the Study Team
No
1
Work Selected
Establishment of NOC
Priority
by MPT
High
Expected
Completion
Attention: not
enough time for
detail planning
Long period of
time are required
to implement all
proposed routes
by MPT
MPT is not able
to wait the
completion by
ODA Loan
Fitting to
ODA Loan
Equipment to
be procured
by ODA Loan
should be on
priority
Concentrate
to Backbone
routes
between 3
major cities
2
DWDM Transmission
Equipment to existing
or on-going FOC
High
3
FOC Installation with
DWDM
High
5
DWDM to satellite
communication link
High
No obstruction
Relation to
work No.14
Work will be
formulated as
sole project
Integration
with Work
No. 8
6
Submarine Cable
Installation
High
Long period is
required to
settlement of
environmental
issues and
negotiation with
foreign operator
7
Improvement of OSP
facilities for Metro
NW in 3 major cities
High
No obstruction
6-4
Result
○: selected work
○
○
3 routes between 3
major cities(*)
○
○