Final Report
Category
Others
Chapter 9 Environmental and Social Considerations
Impact Item
Stage
Work
Reduction measure
Infections
such as
HIV/AID
Construction
Duct laying
Pole
erection
Building
Working
condition
(including
safety)
Construction
Duct laying
Pole
erection
Building
Traffic
Accident
Construction
Duct laying
Pole
erection
relocation for
activities. After
recovery, possible
to return original
location.
①
Instruction
and
enlightenmen
t to workers
② Medical
check in
advance for
temporary
labors.
Safety training
and provision of
safety equipment
Implementation of
Traffic safety
measures
Executing
Agency
Responsible
Agency
Cost
bearing
Contractor
MPT
Contractor
Contractor
MPT
Contractor
Contractor
MPT
Contractor
9.4.5 Monitoring plan and monitoring form (draft)
In order to check the effects of the impact-alleviating measures, the situation will be monitored
before the start of work, during the work and at the time of completion of the work. The monitoring
items, frequencies and locations, and the agency responsible are shown in Table 9.4-6. It is planned
that the report on the monitoring results will be submitted to the project implementing agency, MPT.
Table 9.4-6
Impact Item
Procedure
Work
Common
Monitoring
reduction
measures
Air pollution
NOx、SPM、CO
for
All work
Duct lying
Building
Disposal
Monitoring Plan
Disposal
of
packing material
Duct laying, pole
erection,
Soil disposal
Equipment
installation
Duct laying
Pole erection
Location
All construction sites
①
Yangon, Naypyitaw,
Mandalay
② Select 3 routes on
heavy traffic
roads(Detai design
period)
③ Bld construction site
in MPT
Installation site
Construction site on
public roads
9-19
Timing
Responsible
Before
commencement
Once/month
during
construction
At completion
Before
commencement
3 times during
machinery use
At completion
MPT
At completion
MPT
At completion
MPT
MPT