Final Report Chapter 9 Environmental and Social Considerations Class Impact item Social Regional Environment economy such Survey result Sidewalk vender is available along the part of FOC laying routes. as employment and life stile Infection such as Although In the past case, it was not reported the occurrence of infection HIV/AID disease during the construction period, it was found that preventive measures for expanding the infection diseases should be required in this project as JICA is implementing the preventive measure project in Myanmar focusing on 3 major infections like HIV/AIDS, tuberculosis and malaria. Working In the past case, work accident was not reported during the construction period condition and past case was not available in the questionnaire to MPT. (including safety) However, work accident is possible to happen every time and it should be required to take preventive measures including the training. Others Traffic accident MPT does not recognize the traffic accident during road digging, pole erection and fiber optic cable laying construction period. However, traffic accident is possible to happen every time and it should be required to take preventive measures including the training. Table 9.4-4 Results of Assessment of Impacts on Environmental and Social Aspects Impact Category Item Pollution Social Environment Classification In Scoping Classification Based on Survey Construction Operation Construction Air pollution B- D B- D Disposal B- D B- D Noise, Vibration B- D B- D Regional economy such as employme nt and life stile Infections such as HIV/AID C- B+ B- B+ C- D C- D 9-17 Reasons of Classification Operation Construction:Increase of air pollutant from construction vehicle and machinery. Construction: ① Waste by packing materials for facilities ② No impact due to recovery of cutting of road surface. ③ No waste soil for leveling work within MPT premises ④ Temporary materials for construction of building are able to reuse. Construction:Noise and vibration are expected by construction machinery. Construction:Impact to sidewalk venders along the part of construction routes is concerned. Construction:Expansion of infections by unskilled labors is concerned.

Select target paragraph3