Final Report
Chapter 8 Project Implementation Plan
As mentioned above, it cannot be denied that in general human resources are inadequate for
dealing with new technology. In order to improve this situation, the following measures should be
taken.
MPT employees have the knowledge needed for the existing facilities, as well as a certain level
of basic knowledge. Therefore, during the processes to be implemented under this project including
construction and equipment testing, the shortage of human resources will be tackled through
appropriate
training,
mainly
offered
by
manufacturers
on
the
introduction
of
new
facilities/equipment.
Since design work requires higher technical knowledge than is required in construction or
testing work, training will be given by consultants. In the case of the LD Division in particular, it is
expected that in the future there will be a need to train up engineers with a good knowledge of new
technology so that the networks proposed for the smaller cities can be designed. Further, it is
believed that the IT Department needs to meet the demand for increasingly higher Internet access
speeds as well as increase the number of personnel.
In addition, as described above, it is considered that many of the personnel in charge have not
had sufficient opportunities to acquire a general knowledge of digital technology. In order to meet
various demands in the future, long-term plans for human resource development need to be drawn up.
To this end, as described in Chapter 11, there is a need for further improvement of the training
provided at training centers.
(3) Financial capability
1)
National budget
When a hearing survey was conducted for the Director of Central Statistical Organization
(CSO) concerning budgets, we were told that the 2011-2015 budget plan had been taken back to the
drawing board. Study Team obtained profit/loss statements (P/L) and balance sheets (B/S) for
FY2010 to 2012.
2)
Financial indicators
In this section, the financial indicators provided by MPT will be described. Tables 8.1-2 to 8.1-4
show the financial indicators, P/L and B/S.
In order to confirm their repayment capability, the growth potential of MPT was evaluated. A
trial calculation was made by applying the formula of Sustainable Growth Rate (SGR) (SGR is the
maximum growth rate at which a corporation can grow continuously using its own internal cash flow
and without obtaining funds externally, such as a loan or capital increase).
An evaluation of the financial indicators shown in Table 8.1-2 clearly shows that almost no
funds have been raised externally for the past 3 years and the Net Profit Margin, Total Assets
Turnover, Equity Multiplier and Retention Ratio are all stable, which indicates that MPT has been
continuously on a growing trend thanks to its internal cash flow.
8-5