Chapter 8 Project Implementation Plan
As described above, a look at the LD Division’s capability to implement works reveals an
inadequate number of personnel capable of handling new technology, with a total of only 14
engineers working in fiber optic cable transmission. In order to improve this situation, it will be
necessary to deploy personnel from the microwave communications unit and provide them with the
necessary training.
2) Metro networks within the 3 metropolitan cities
Metro networks within the 3 metropolitan cities are managed by the Auto Phone Division,
which is composed of a local telecommunications line unit and an exchange facilities unit. These
units are responsible for the planning, design, supervision (construction works) and
maintenance/operation of telecommunication lines and exchange facilities, respectively.
Exchange facilities unit
・ Construction specifications: In principle, MPT employees and vendors work together in
execution design, and documents and drawings including specifications are also prepared
jointly under the supervision of MPT.
・ Construction: Normally, suppliers carry out construction work, while MPT employees
participate in the work along with the suppliers partly for the purpose of OJT.
・ Supervision/testing: A testing team is set up, with participation by local engineers and
suppliers.
・ Maintenance/operation: Regular operation, supervision and scheduled maintenance are
carried out by MPT employees.
Communication line facilities unit
・ Construction specifications: In principle, MPT employees carry out the execution design,
and documents and drawings including specifications are also prepared by MPT.
・ Construction: Constructors and suppliers take joint charge of construction works.
・ Supervision/test: Skilled engineers conduct tests.
・ Maintenance/operation: Regular operation, supervision and scheduled maintenance are
carried out by MPT employees.
Under this project, it is planned that new fiber optical cables will be installed and for that reason,
it is necessary to have personnel who can understand new technology, due to the planned
introduction of DWDM. It is also necessary to develop human resources able to deal with new
technology in a consistent manner for works ranging from cable laying to equipment testing. (See
Chapter 11.)
3)
IT network
The ISP group in the Information Technology Department (IT Department) manages the
nation-wide network with a total of 12 employees including EEs. The Internet in Myanmar is
expected to grow in the future, and due to the shortage of human resources it is necessary to make
plans to increase the number of personnel and to develop human resources.