Draft Final Report
Chapter 7 Outline of Scope of Works
(12) Thilawa SEZ Circuit
Outline of Subproject
Establish a 10G fiber optic network between Thilawa SEZ and Thanlin
Table 7.2-12 Equipment List
No
Name
1
CWDM
2
10G Router
3
L2 Switch
4
Fiber Optic Cable
4-1
SEZ to Thanlyin
Specification
2set
Integrating communication
signals for access network
2set
Installing optical cable between
Thilawa (SEZ) and Thanlin
station
Installing optical cable between
Thilawa (SEZ) and Marine
University
Conduits for introducing fiber
optic network between Thanlin
and Thilawa SEZ
Terminating optical cables
3km
5
Conduits for underground
installation
6
Terminal box for fiber
optic cable
Outside construction with terminal
blocks with pedestal
SEZ to Marin University
Q'ty
WDM Transmission for Metro
network between Thanlin and
ITMC(Yangon City)
IP Transmission network
between Thilawa and YangonI
SP (POP)
Function: Fiber Optical Cable
Capacity: 8 core
Configuration: ITU-T G.652
Function: Fiber Optic Cable
Capacity: 8 core
Configuration: ITU-T G.652
Installation: Buried
Diameter: 100φx 4 conduits
4-2
Note
Function: Optical Multiplexing
Capacity:10G x 1
Configuration: 10GEthernet interface
Function: 10GbE Router
Capacity: 10Gbps
Configuration: Support
1000Base-TX/LX 10G-BaseER/LR
Function: L2 Switch
Capacity: 1Gbps/10Gbps
Configuration: 1000BaseTX x 24 Port
10G-BaseER/LR x 4Port(Optical)
Support
STP(IEEE802.1D)/RSTP(IEEE802.1
W)
2set
7km
10km
1set
Source: Survey team
7.3
TOR for Consulting Services
The project component described in Section 7.1 is an upgrade plan for an information and
telecommunications network that will serve as an important foundation for economic development
in Myanmar. It comprises diverse specialist fields such as transmission equipment, IP network
plans and route engineering work. Based on the above, when implementing this project,
engineering services such as appropriate design and work supervision by consultants composed of
engineers in diverse areas of specialization will be necessary. Selection of the consultants will be
the responsibility of the MPT which is the implementing agency for this project and will be
conducted based on the Guidelines for the Employment of Consultants under Japanese ODA Loans
(April 2012) established by JICA. TOR for selection of the consultants is shown below.
(1) Scope of consulting services
The consulting services applied to this project are divided into three stages, detailed design
stage, bidding support stage and construction stage, based on the project implementation schedule
7-58