Draft Final Report Chapter 7 Outline of Scope of Works (12) Thilawa SEZ Circuit Outline of Subproject  Establish a 10G fiber optic network between Thilawa SEZ and Thanlin Table 7.2-12 Equipment List No Name 1 CWDM 2 10G Router 3 L2 Switch 4 Fiber Optic Cable 4-1 SEZ to Thanlyin Specification 2set Integrating communication signals for access network 2set Installing optical cable between Thilawa (SEZ) and Thanlin station Installing optical cable between Thilawa (SEZ) and Marine University Conduits for introducing fiber optic network between Thanlin and Thilawa SEZ Terminating optical cables 3km 5 Conduits for underground installation 6 Terminal box for fiber optic cable Outside construction with terminal blocks with pedestal SEZ to Marin University Q'ty WDM Transmission for Metro network between Thanlin and ITMC(Yangon City) IP Transmission network between Thilawa and YangonI SP (POP) Function: Fiber Optical Cable Capacity: 8 core Configuration: ITU-T G.652 Function: Fiber Optic Cable Capacity: 8 core Configuration: ITU-T G.652 Installation: Buried Diameter: 100φx 4 conduits 4-2 Note Function: Optical Multiplexing Capacity:10G x 1 Configuration: 10GEthernet interface Function: 10GbE Router Capacity: 10Gbps Configuration: Support 1000Base-TX/LX 10G-BaseER/LR Function: L2 Switch Capacity: 1Gbps/10Gbps Configuration: 1000BaseTX x 24 Port 10G-BaseER/LR x 4Port(Optical) Support STP(IEEE802.1D)/RSTP(IEEE802.1 W) 2set 7km 10km 1set Source: Survey team 7.3 TOR for Consulting Services The project component described in Section 7.1 is an upgrade plan for an information and telecommunications network that will serve as an important foundation for economic development in Myanmar. It comprises diverse specialist fields such as transmission equipment, IP network plans and route engineering work. Based on the above, when implementing this project, engineering services such as appropriate design and work supervision by consultants composed of engineers in diverse areas of specialization will be necessary. Selection of the consultants will be the responsibility of the MPT which is the implementing agency for this project and will be conducted based on the Guidelines for the Employment of Consultants under Japanese ODA Loans (April 2012) established by JICA. TOR for selection of the consultants is shown below. (1) Scope of consulting services The consulting services applied to this project are divided into three stages, detailed design stage, bidding support stage and construction stage, based on the project implementation schedule 7-58

Select target paragraph3