4
4.9
(such as tower companies and fibre cable digging companies) to have robust
stakeholder engagement procedures that are grounded in a concept of respect for
rights holders. This should be backed up with training to ensure that site hunters
understand the core concepts of treating stakeholders fairly. With such a large
number of stakeholders to deal with, and the race to construct infrastructure to meet
licensing targets, there is a clear risk of stakeholders being treated only as one more
item in a long checklist. While many interactions with stakeholders will be routine, the
lack of awareness of many stakeholders of even what the network rollout activities are
all about, much less their rights, makes many of the stakeholders, particularly in rural
areas, at risk of unfair practices. This is an area where the tensions could arise
between commercial pressures on tower companies and fibre laying companies to
meet time targets and good practice on stakeholder engagement and even on
respecting rights. While the fee companies pay for access to land for infrastructure
varies according to a number of factors including assessed damages to crops, or
overall disruption by workers on site, the procedures should be consistent, transparent
and accessible to stakeholders and in particular those with whom companies are
negotiating. See Chapter 4.7 on Land for further information.
Provide accurate, accessible and timely information: Companies should be
prepared to engage with stakeholders with a very low level of literacy, scientific
knowledge or understanding. They should be prepared to respond in a way that is
simple, accurate, balanced and understandable in local languages. This includes
health and safety issues (whether the tower could withstand earthquakes or severe
weather; concerns about unsafe levels of radiation from the tower (see below);
concerns about being electrocuted by the tower during rain showers); information
about which companies are involved in the tower site and where future questions or
concerns should be directed. They should also provide clear explanations to potential
customers about potential costs (such as for roaming), privacy, etc.
Require and monitor engagement carried out by business partners: Subcontractors are often the first ‘face’ of forthcoming operations for the rollout of the
network, sales of SIM cards or sales of other ICT equipment or services. Many of
these will be local companies, including very small shops. Most companies operating
in Myanmar, local and foreign, are unfamiliar with the concept of stakeholder
engagement, including opening their business up to receiving complaints directly from
workers and local communities through grievance mechanisms. Sub-contractors,
particularly in construction, will need training and incentives/ disincentives to develop
positive relationships with local communities from the earliest phase of roll-out.
Engage constructively with civil society: Local and international civil society
organisations provide necessary support to local communities to hold government and
companies to account. Companies are encouraged to engage openly with civil society
and community based groups to understand their concerns and provide accurate and
timely information. They should model behaviour about the right to freedom of
expression that demonstrates support for the right, both in law and in practice.
Dealing with criticism through constructive engagement should encourage the
authorities to do the same, rather than accusing civil society groups of “stirring up
opposition”, or even arresting them 630 . When there are arrests or violence in
connection with a company’s operations that violate human rights, companies should
raise the issue with the Government, whether quietly or publicly, individually or
collectively, to express their concerns.
630 See
OHCHR, “Report of the Special Rapporteur on the situation of human rights defenders, Michel Forst”
A/HRC/28/63 (29 December 2014), reporting on risks faced by land and environmental activists around some
extractive projects.
250
PAGE
CHAPTER 4.9: STAKEHOLDER ENGAGEMENT & GRIEVANCE MECHANISMS
Select target paragraph3
Connect to a paragraph
Connect to an entity
Disable highlights
Add to table of contents